Back Porch steps

back porch steps to cabin

simple steps for beach cabin

cabin back porch

Easy steps six feet wide, with three 2 x 4 on each step. 12 inch concrete pads landing.

After living in the cabin for three months I found that the area for the back porch gets very very little sun.  Thus no large $$$…just nice steps.   2015-06-18 09.07.11


Dry pond 2015 water shortage

2015-08-21 11.49.51

dry pond as you approach from the path

2015-08-21 11.50.30

Animal tracks, beaver, dog, bird and more

2015-08-21 11.50.43

Blue Heron tracks

2015-08-21 11.54.56

Green grass and very moist soil

2015-08-21 11.54.29

More blue heron tracks

2015-08-21 11.54.09 2015-08-21 13.08.20 2015-08-21 13.08.32


Window sills complete

2015-07-20 08.49.14

Window sill complete with one coat of varish

2015-07-20 08.49.29

Window sill complete with one coat of varish

2015-07-20 08.49.43

View from the back window


Additions to Drainfield and first window sill

2015-07-07 09.01.50

Deer on the drain field

2015-07-07 11.49.15

Sill at kitchen sink area, pine.

2015-07-07 11.49.19

Notice the nice fit! Tight with very little gap. Pine board will need sanding, stain and gloss finish

2015-07-07 11.49.25

Notice the nice fit!

2015-07-07 11.50.35

St Francis, found object refurbished and enhanced for garden area.

2015-07-07 11.50.44

Drain field corners, added these found rope and created a driftwood pier look.

2015-07-07 11.50.56

Drain field corners, added these found rope and created a driftwood pier look.


Update for June First 2015

2014-12-30 15.23.32 2015-01-25 14.17.19 2015-01-25 14.17.32 2015-01-25 14.17.45 2015-01-25 14.17.55 2015-01-25 14.18.09 2015-01-25 14.18.26 2015-01-25 14.18.29 2015-01-25 14.18.43 2015-02-14 08.43.32 2015-02-14 09.43.28 2015-02-15 13.41.29


Kitchen Taking Shape

kitchen and floors 004

First paint on the floors

kitchen and floors 003

standing on the ready…just six feet of counter space, sink in the middle

kitchen and floors 006

Nice fit with the range and refrig

kitchen and floors 002 kitchen and floors 005 kitchen and floors 008 kitchen and floors 010 kitchen and floors 011 kitchen and floors 013 kitchen and floors 014


Fourth of July 2014 Update

4th of july 001

Mother deer and baby playing on the drain field

4th of july 002

new bathroom vanity

4th of july 003

new and ready for use

4th of july 004

lighting in the general living room area

4th of july 005

fan in bedroom

4th of july 006

living room area lights

4th of july 008

kitchen lights

4th of july 007 4th of july 009


Last Weekend In June 2014

Dolphin june 30 2014 003

Selfie at the beach

Dolphin june 30 2014 006

Beach Grass on the path to the waters edge

Dolphin june 30 2014 011

Path from Connor Creek to the ocean

Dolphin june 30 2014 012

Connor Creek

Dolphin june 30 2014 017

Bridge across Connor Creek

Dolphin june 30 2014 013


Drywall Complete – Final images

drywall final 2014 007 drywall final 2014 001 drywall final 2014 002 drywall final 2014 003 drywall final 2014 004 drywall final 2014 005Bill Ellis of Ocean Shores WA did a great job on the drywall and painting ! Thanks Bill !


Drywall Update – Textured and ready for Primer

Drywall Update –

Texture drying  in kitchen area

Texture drying in kitchen area

Texture drying  at front door

Texture drying at front door

Texture drying  in storage area in bathroom

Texture drying in storage area in bathroom

drywall texture 2014 008 drywall texture 2014 007

Texture drying  on space above shower

Texture drying on space above shower

drywall texture 2014 005

storage in bedroom

storage in bedroom

Utility room

Utility room

drywall texture 2014 002

Texture drying

Texture drying

Textured and ready for Primer on Mondaydrywall june part 3 2014 013


Drywall Update for Monday the 16th

Work moves along….drywall june part 3 2014 001 drywall june part 3 2014 002 drywall june part 3 2014 003 drywall june part 3 2014 004 drywall june part 3 2014 005 drywall june part 3 2014 006 drywall june part 3 2014 007 drywall june part 3 2014 008 drywall june part 3 2014 009 drywall june part 3 2014 010 drywall june part 3 2014 011 drywall june part 3 2014 012 drywall june part 3 2014 013


Drywall Update for Friday

drywall june part 2 2014 004 drywall june part 2 2014 005 drywall june part 2 2014 006 drywall june part 2 2014 007 drywall june part 2 2014 008 drywall june part 2 2014 009 drywall june part 2 2014 010 drywall june part 2 2014 011


Drywall Up and Ready for Inspection

Mess outside front door

Mess outside front door

Looking at Pantry in Kitchen area

Looking at Pantry in Kitchen area

Looking at space in kitchen

Looking at space in kitchen

drywall june 2014 004

Looking towards bedroom area

Looking towards bedroom area

two closet spaces in bedroom

two closet spaces in bedroom

above closet space

above closet space

space / storage in bathroom

space / storage in bathroom

drywall june 2014 009 drywall june 2014 010 drywall june 2014 011 drywall june 2014 012 drywall june 2014 013 drywall june 2014 014 drywall june 2014 015 drywall june 2014 016 drywall june 2014 017 drywall june 2014 018 drywall june 2014 019 drywall june 2014 024 drywall june 2014 025 drywall june 2014 026 drywall june 2014 027 drywall june 2014 028 drywall june 2014 029 drywall june 2014 030 drywall june 2014 031Drywall Up and Ready for Inspection


Ready For Drywall – May 2014

ready for drywall may 2014 004

Francelle cleaning the cabin floor..getting ready for the drywall contractor

ready for drywall may 2014 007

Drywall begins June 2nd

ready for drywall may 2014 002

Great weekend..afternoon sun, very lazy day at Copalis Beach

ready for drywall may 2014 003

Conner Creek looking very nice on a Saturday, no rain, clear skys

ready for drywall may 2014 005 ready for drywall may 2014 006 ready for drywall may 2014 008


Image

Bald Eagle Visiting

bald eagle in front yard CLOSE UP


Image

March 2013

MARCH 2013


Gallery

February 2013 Beach Visit


Gallery

January 2013 at the Beach Cabin


Electrical installation complete

This slideshow requires JavaScript.

Over a period of three rainy and puddle filled days Buck Electric of Ocean Shores installed the rough in electric for the small house.


Rough in Plumbing Complete

This slideshow requires JavaScript.

With Gordon’s expert advice, guidance and experience, I was able to “complete” the rough in plumbing. My Readers Digest How-to-do-it Plumbing Guide was just not enough. 

 Shower is 36″ x 36″, stacked laundry area in the mechanical room, and the bathroom will have plenty of storage overhead. First rain today tested my roofing job and the gutter system. 

Proud to report all are working fine, no leaks! Next up : rough in electric. . .


Cedar Siding Complete

This slideshow requires JavaScript.


Cedar Siding Progress

This slideshow requires JavaScript.

Joe continues to make progress on the cedar siding.  He added a nice T & G covering over  the porch, which added a very “cabin” feeling to the entry.  Today he will begin on the front wall.  Septic tank and drain field were covered yesterday.  We are moving along…maybe Francelle and Iwill be able to celebrate Christmas at the beach cabin.  Maybe !


Siding – One wall complete

I have hired Joe to start on the cedar siding on the  North side of the beach cabin.  Here is two days worth of his hard work.  A masters work! Thanks Joe.


Windows and Doors Installed

This slideshow requires JavaScript.