Cedar Siding Progress
This slideshow requires JavaScript.
Joe continues to make progress on the cedar siding. He added a nice T & G covering over the porch, which added a very “cabin” feeling to the entry. Today he will begin on the front wall. Septic tank and drain field were covered yesterday. We are moving along…maybe Francelle and Iwill be able to celebrate Christmas at the beach cabin. Maybe !
Like this:
Like Loading...
Related
This entry was posted on September 22, 2012 by reynoldsreporter. It was filed under Small homes .
Leave a Reply