Small Home under 600 square Feet

Cedar Siding Progress

This slideshow requires JavaScript.

Joe continues to make progress on the cedar siding.  He added a nice T & G covering over  the porch, which added a very “cabin” feeling to the entry.  Today he will begin on the front wall.  Septic tank and drain field were covered yesterday.  We are moving along…maybe Francelle and Iwill be able to celebrate Christmas at the beach cabin.  Maybe !

Advertisements

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s