Monday and Tuesday found me assisting the foundation subcontractor with the remaining stem walls.  The walls need to be three feet off the footing.  I am now an expert in cutting rebar, tying rebar, and running around picking up rebar.  They even let me go to the store and buy MORE rebar!  Later in the day we installed the massive hold down bolts, vents and outlets for water and sewer.  Being the new guy on the project, I was the dirtest. Mud and water all over my pants, rustly hands, but..I was having fun.  I have learned a great deal being an active part of the construction of my small beach home.  I called for an inspection of the foundation wall for Tuesday.  After the “Okay” from Grays Harbor county, the pumper truck arrived, then concrete truck, and I allow the professionals to go to work.

This slideshow requires JavaScript.

Advertisements

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s