Small Home under 600 square Feet

Utilites, Revisions, and Reviews – an update

After our clearing, and the permit granted by Grays Harbor County, water service was ordered and installed.  Electric and the temporary electric pole are still pending.  The pole required is 18 feet high, and a bit much for me to load into my small car, and duct taping it to the roof was not an option. I still do not know why.

The roof pitch was changed, lowered, to a 6 / 12, with a 4 / 12 pitch on the inside cathedral ceiling. I also had the front door sidelights removed, one window removed.  This simplified the front of the house, and eliminated the need for factory made shear walls. These changes were suggested by a very experienced contractor that has agreed to work with me on this project.  His years of building experience will be an major asset the cabin build.

Advertisements

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s